Have taken some shots of my first layout, Haul Y Bryn. Freelance Welsh set near a small slate works but now struggling against some of the bigger quarries the line is only just getting by on a small passenger service and the odd freight train. The station is built on a low terrace while on the level above will be a small row of shops. On the right hand side of the layout I intend to build some slate workers cottages and below these a small goods yard with a sheep/cattle dock. The black foamboard that runs along the board is going to be built into dry slate walling using strips of card of different thickness. Hoping to crack on with some more of the scenic work other these Winter months.

Eddie

EDGOZ2WAR


EDGOZ2WAR

And as you can see the station is quite close to the front of the board which is why I want as much detail as possible inside the station building.

B.Meldon

Hi Eddie
This is looking good so far.
I see that you have a wire in tube system for point operation. If you have not done so already I would recommend some type of electrical switching for the points. Using the point blades only to switch the power can be very unreliable.
One simple solution I have used in the past is to fit a two way switch at the control end of the wire. This can also make the points more positive in operation.
Brian Meldon
Brian Meldon

EDGOZ2WAR

I have heard that this helps but how easy is it to do with peco 009 points. I have some switches that can be activated on top of the board but I am a little unsure about the wiring.

Eddie

B.Meldon

You will need a two way switch.
The centre common of the switch is connected to the frog (The V in the middle of the point.) The two sides of the switch are connected one each to the stock rails. (The two fixed outer rails.)
As the point changes direction the switch will connect the frog to the appropriate stock rail.
Depending on the type of switch you use it should be possible to attach the end of the point control wire to the moving part of the switch. I have done this in the past with both slider and toggle switches.
Even if you use point motors switching is still required for reliable running.

As a matter of interest did you test your layout with a loco before you balasted the track?

Brian Meldon
Brian Meldon

EDGOZ2WAR

Hi Brian

Yes locos run through okay but think that I may need the extra measure. Will I need to put a cut near the frog or as I have fitted isolating fishplates as per the instructions can I go ahead and wire it up. If I do need to cut the point, where would be the best place ?????.

Regards

Eddie

B.Meldon

No cuts on the point are necessary as the switches only duplicate the switching action of the points. If the layout works as it is with the insulating fishplates you have already fitted all you need to do is add the wires and the switches.
Brian
Brian Meldon

EDGOZ2WAR

Many thanks Brian. Holes drilled and dropper wires going in over the weekend.

Eddie

EDGOZ2WAR

Hi Brian

Have wired up the points and all is working well  ;D but I did notice last night when running some Locos through that the wheels lifted when they got to the crossing Vees. Is this normal....

B.Meldon

Hi Eddie

Yes, unfortunately it is a known problem.

The first thing you have to do is to check the back to back measurements of all the wheels.
Even when new I have found several locos and rollinng stock to be incorrect.
Use an N gauge back to back gauge to check, like this one:

http://www.wellingtonmodels.com/image.php?image=http://www.wellingtonmodels.com/cdata/20461/img/20461_857688.jpg&sCaption=-NaN-

There are several others, it should cost under
Brian Meldon

EDGOZ2WAR

Hi Brian

The problem only seems to happen with the locos running in one direction (the toe end). I am running a dapol 14xx chassis on one of my locos and a GF 94xx on another, both seem to have the same problem. I was tempted to take a small needle file to the plastic part of the Vee and try and make it a bit deeper. At the moment it doesn't stop the engines running but it does look odd.

Regards

Eddie

B.Meldon

Ok Eddie

It will not be the depth of the flange way that is the problem.

Provided you have made sure that your back to back wheel measurements are correct it is almost certain the location of the V in the centre of the point that will be the cause. It is too close in gauge to the fixed outer curved rail.
So when the flange of the leading wheel reaches the point of the V it will ride up on it.

When you look down on a Peco 009 point and follow the curved path through the centre frog this problem is obvious.

The other problem can be the start of the guide rails. You will have to look closely to see exactly where the problem is with you locos.
Making the start of the flange guide rails less abrupt will cure this.

Just because the chassis are new it does not mean the back to backs will be correct. Out of 3 Dapol 14xx that I purchased direct from Dapol, only one had all wheels set correctly to gauge. But then at
Brian Meldon

JulienW

Quote from: B.Meldon on January 15, 2010, 09:23
<snipped>
Nothing in 009 is straightforward and this like many other things needs experience to get it correct.

Brian Meldon


Never truer words, Brian

Perhaps we can ask Mark (Howe) to put that as a header and/or footer on eaqch page of the News! :laugh:
Julien Webb - 1720

EDGOZ2WAR

Hi Brian

Result  :)  openned the check rail slightly with a needle file and then to my horror found some ballast that had taken up residence near to the vee. A short sharp shock from a small screwdriver and hooray...... smooth running. Many Thanks for your help.