• Welcome to 009 Society Members Forum.

The Sibford Hills Railway

Started by 9396CLAS, December 22, 2025, 20:09

Previous topic - Next topic

9396CLAS

In the OO9 News, November 2025 there is an article about The Sibford Hills Railway.
I'm trying to relate the photograph of The Whole Layout with the Track Plan, in particular is there crossover of the track in red? I would have thought it was inadvisable to have a crossover in the hidden track. Or are the tracks at deferent levels?

JulienW

With this style of 'rabbit warren' layout I strongly suspect the area highlighted have the tracks crossing at different levels...
Julien Webb - 1720

Graeme Dunbar

#2
Taking a close look at the photos in the 'News', the cross-over can be seen in the first photo showing construction (top right, just under the skylight) and the one at the bottom of page 16 above the word 'will' in the caption. The do appear to be on the same level, just above the river level.
Graeme Dunbar - 4441

Keith Hicks

This is a standard X crossing at one level.  The original design by C J Freezer showed the track at different levels, but I couldn't make it work, so I used an N gauge crossing.

B.Meldon

#4
X crossings are not good anywhere on a 009 layout, the two dead sections and flange gaps on each rail can and often do cause the locos to stall at slow speeds. It is best to avoid crossings altogether! Just change the track plan slightly so the two tunnel entrances along the front are connected and the one next to the river bridge goes towards the back of the layout. This will remove the crossing from the track plan.
Brian Meldon

B.Meldon

Something else that may affect the sidings is that 009 couplings do not couple up at all well on curves.It is best to make any sections of track, in sidings for example, that you think you may want to couple rolling stock to locos or other rolling stock stright.
Brian Meldon

Terry Mowles

I think you'll find there is no crossing used and that the tracks are at different elevations.

The photo on page 16 shows the difference in elevation of the tracks before they enter the tunnels.

9396CLAS

Terry,

I see what you mean, but the more I look at the photo it appears as if the photo is misaligned where the white rectangle is at the bottom, i.e. a slice of the photo has moved up.

Does Keith Hicks have another photo of that section of the layout?


 

Graeme Dunbar

I think the man himself has spoken a few posts back. No need for speculation! (It is an N gauge crossing.)
Graeme Dunbar - 4441

JulienW

Quote from: JulienW on December 22, 2025, 21:32With this style of 'rabbit warren' layout I strongly suspect the area highlighted have the tracks crossing at different levels...
Quote from: Keith Hicks on December 23, 2025, 10:30This is a standard X crossing at one level.  The original design by C J Freezer showed the track at different levels, but I couldn't make it work, so I used an N gauge crossing.

I stand (well, sit at the computer) corrected.  Thanks for the clarification Keith.
Julien Webb - 1720

Terry Mowles

Apologies, I somehow missed that post, probably time for new spectacles.

B.Meldon

Here is a modified track plan that removes the crossing:
Brian Meldon

Keith Hicks

This alternative track plan is a thought, but I have never had any problems with loco's stalling on the crossing.  I did have an uncoupling but I found that it was down to a poor adjustment of the couplings.