• Welcome to 009 Society Members Forum.

Haythornthwaite & Westby Tea Railway - upper level planning

Started by Tom Haythornthwaite, December 02, 2018, 13:49

Previous topic - Next topic

Tom Haythornthwaite



Here's my plan for the upper level of the Haythornthwaite & Westby Tea Railway.  Heights shown are above the floor - so this route rises 27 cm all in all with a maximum grade in the zig-zag of 2.4% to be assisted with PowerBase ... which will be tested after I collect my huge Hattons order at Christmas.

The upper terminus is a separate tea factory and passenger station.

The loop to the right has to go off scene to maintain my 30 cm radius goal.  (Being in a short tunnel it will be able to break the plane of the back scene which is held 4 cm from my walls.)

Comments invited!
Haythornthwaite & Westby Tea Railway
OO9 Society Diary Manager.  Please send event information to diary@009society.com.
(If you send them to dairy@009society.com there will be no use crying about it.)

JulienW

Couple of initial thoughts if I were building it*

It looks as thought the loops in the top station are longer than the headshunts on the zigzag, particularly the pair at datum + 159cm.

I wonder about having two headshunts at this point. I can see that you can pass trains at this point having an 'up' and 'down' switchback but I don't recall seeing this set up in real life (though I'm happy to be corrected on that).

That being said I dimly recall seeing a photo of a South American line that used a scissors crossing so that either siding could be used of either up or down (something like the L&LSR's Tooban junction at the end furthest from Londonderry) and may have been used so that a single points failure didn't block the whole line.

Apart from that it looks an interesting plan.

*at the end of the day it's your layout so feel free to ignore the above!
Julien Webb - 1720

Tom Haythornthwaite

Thanks Julien;

Completely fair point about the head shunt lengths; they will need attention.  Actually I'm waiting to test trains on my helix with PowerBase to know what lengths I can run and of course I'll need to be consistent and logical.

Until a few days ago my main line was going to stop at the lower level shown here and all the rest was going to be a branch line.  But now I'm turning it all into the main line.

I think I'll probably keep the scissors (thanks for the terminology) to give another place for trains to meet but that's not fixed in stone or even ballast yet.

Haythornthwaite & Westby Tea Railway
OO9 Society Diary Manager.  Please send event information to diary@009society.com.
(If you send them to dairy@009society.com there will be no use crying about it.)