• Welcome to 009 Society Members Forum.

L&B semi open coaches

Started by pilotfriend, April 27, 2009, 10:19

Previous topic - Next topic

pilotfriend

The last coach to be built for County Gate is a 'what if'? The original coaches supplied to the L&B were really rather heavy and as a consequence, train lengths were limited to 3 coaches for the locomotives. On takeover by SR, an option would have been to build lighter coaching stock for peak periods.

Below is what I think they could have been.


nicknamed 'monsoon' by the staff as deployment nearly always seemed to bring down the skies!

regards
JdF

MickT

Nice one John, but will it really be the last coach for CG?

I can't imagine that the rich set such as retired aeronautical types etc would accept excursion travel in such spartan accomodation. What about a luxury Pullman train for just such august and priviledged people - something along the lines of a Rhaetian rather than modern Welsh Highland design perhaps?

And then of course there needs to be something suitable for the directors of the Glenthorne Harbour Authority extension - surely they can't be expected to travel in the ramshackle railcar unit?

:angel:

Mick

pilotfriend

All good ideas, Mick, but we really do have the required trains now. The Glenthorne family prefer transport by Rolls! On a good day, I would imagine that the Monsoon coaches would have been popular for excursions. Hell, once I braved the Silverton Durango in a similar car round Xmas with 2 metres of snow on the ground!
best
JdF