009 Society Members Forum

Modelling => Layouts => Topic started by: Isle of Stoner on April 11, 2012, 14:56

Title: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on April 11, 2012, 14:56
I've been a busy bunny over the last couple of days so Underhill finally has some colour and plant life.

http://isleofstoner.blogspot.co.uk/

Pictures and words, both a little fuzzy.


John W
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: tedp on April 11, 2012, 17:37
Looking good, your Lordship.    ;D 

I wonder how you made those trees. I have been chickening out buying a forest in a box last summer, for my own new project. 
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on April 12, 2012, 09:31
I cheat with trees and buy them. There are a selection of makes as I just buy trees when I see some I like when the funds allow, the pine trees are from Unit models and I think they are great, all hand made. The rest are a mixture of Auhagen, Hornby and so on. I grew up in Surrey and spent many happy hours wandering and playing on the North Downs when I was a lad (some time ago now).As with all modelling, observation is the key to realism. I'm pretty pleased with the effect but there is plenty of detail to be added yet, I made a ground frame and modified a water tower last evening.

John W
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: invercloy on April 12, 2012, 11:10
You have most definitely "been busy"! I thought I was working quickly...

It looks very good.

For bought trees I've had some armatures from Realistic Modelling Services (http://www.realisticmodelling.com/catalog.asp?subrange=Trees) (who were probably at Tonbridge, Ted) and they are very good, well detailed and allow you to add the foliage yourself to vary the colour and shape slightly.  I think I may use a few of these mixed with a few I make.
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on October 03, 2012, 05:08
With the December exhibition starting to get nearer I decided that I must bite the bullet and get on with the second Underhill baseboard.

Read more on my blog at http://isleofstoner.blogspot.co.uk/


Cheers


John W
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on November 03, 2012, 18:41
I've finished the woodwork now and the layout is self supporting and quite sturdy too. Now for the wiring!

Check out the blog for details.  http://isleofstoner.blogspot.co.uk/


John W
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: invercloy on November 03, 2012, 23:14
I recognise the background to those photos :)

Looking good, John, I found it made me feel a lot better prepared for exhibiting once I'd completed the legs for Isle Ornsay.

It certainly looks like a sturdy structure you've got there, just got to hope the cheese smoking isn't too enthusiastic with all that timber beneath it  ;D
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: berryr99 on November 04, 2012, 15:51
John,

Progress looks good.

Please can I ask how you made the legs but specifically, do they fold and also how do they attach to the baseboard ?

The reason for asking is that in a moment of weakness (fuelled by too much coffee and cake !) I agreed to build a layout for exhibition and your baseboard and legs setup is the sort of thing I'd like to do. My back isn't too good so I need a bit of height to the layout

Thanks

Bob
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on November 04, 2012, 18:46
Height was important for my dodgy back too.

The legs are just simple trestles made from 18 x 44mm softwood glued and screwed together.

The legs are hinged at the top and so far gravity is holding the baseboards onto them. I may screw some  timber cross pieces onto the layout that the legs can slot between... or not. The first public outing is in December so I'll see how it goes then.

The other dodgy part of the design is the bar that keeps the legs of each trestle apart has a hinge at one end and a kitchen cupboard magnetic catch at the other, I may change that before December, not sure to what though.

Hope that helps.


John W
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: berryr99 on November 05, 2012, 12:37
John,

Thanks for the information.

It is very helpful and has given me the clue about how to do it.

At my age (60+) I can learn new stuff but it takes a while to sink in !

Bob
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on November 05, 2012, 16:31
Learning new stuff is what keeps you alive I think.

Good luck


John W ;D
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on November 07, 2012, 19:52
Lights, camera, action... well anyway I've been a bit busy on the layout. Have a squint at the blog.

http://isleofstoner.blogspot.co.uk/


John W
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on November 27, 2012, 21:42
Much progress on Underhill so have a surf along to the blog for details. http://isleofstoner.blogspot.co.uk/ (http://isleofstoner.blogspot.co.uk/)Will it be ready for the exhibition? Come along and find out.

Porthmadog Santa Model Railways: 8th December
(Organiser: Paul Towers)
The Glaslyn Room,
Canolfan,
Porthmadog,
Gwynedd.
(near FR/WHR Harbour Station)

Opening Times: 10:30-16:00

4 Layouts, 2 Trade Stands
Layouts include "Tuthill" (009) from Dave Holmes, a new 009 layout from John Wooden and a
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Hugh Norwood on March 10, 2013, 21:08
It was great to see Underhill and Port Lucy in the flesh at NGN on Saturday.  :)
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: berryr99 on March 11, 2013, 14:34
John,

Nice to meet you, nice layout and thanks for letting me photograph your legs !

I hasten to add the layout legs !

Bob Berry
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Tigger on March 14, 2013, 12:18
Quote from: berryr99 on March 11, 2013, 14:34
John,
Nice to meet you, nice layout and thanks for letting me photograph your legs !
I hasten to add the layout legs !
Bob Berry
When we were building Buccabury I seem to remember almost getting into trouble by stating I was going to wander around an exhibition studying legs... ;D
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: berryr99 on March 14, 2013, 19:36
I put the legs on Blaenau North this afternoon but they are a bit wobbly - obviously not at good as John's. Maybe I should have used 2 A frames instead of 2 folding H frames.

Bob
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: B.Meldon on March 15, 2013, 10:29
When it comes to layout support legs I have always found that diagonals are the key to stability.
It is possible to use some quite thin wood if it is correctly braced with diagonal supports forming a triangle frame.
Meanderbahn is not a light weight layout yet the legs are made from relatively thin wood. I have never taken a photo of the legs but in this shot of the control panel you can see the approximate size and layout of the wood. The diagonal support to the right of the panel is only about 2cm square and thinned at the top where it fits onto the frame. The main legs are made from 4cm x 2cm (aprox) planed wood with a lower cross member with corner bracing. It is all glued and screwed together:

(https://forum.009society.com/proxy.php?request=http%3A%2F%2Fi663.photobucket.com%2Falbums%2Fuu358%2FM-e-l-l-o-w%2FMeanderbahn%2FMeanderbahnBack.jpg&hash=89967196189985d0137d7348885846ef1324276f)

It is light weight but effective and with hinges at the top the legs fold up in to the support frame for transit.
The only bolts that need to be inserted and tightened are the four from the diagonals into the support frame, and these have wing nuts. The fixing screws  at the other end of the diagonals are just lose enough so they can move and do not need to be re-tightened each time the layout is assembled. When you look at it is appears to be too flimsy to hold the layout but it is not, and after more than 20 years use it has also stood the test of time as well.
Jack Carter knew what he was doing when it came to layout construction, but then with over 50 years practice before he started Meanderbahn that
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Tigger on March 15, 2013, 12:43
The system I eventually built for Buccabury has been very useful, light, stable, adjustable and easy to transport.  I'll dig out some photos.
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Hugh Norwood on March 15, 2013, 16:14
Should we create a new topic on layout legs????
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: DeadHorse on March 15, 2013, 21:38
Quote from: hughn on March 15, 2013, 16:14
Should we create a new topic on layout legs????

That should run for a bit, eh?  ::)
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Graeme Dunbar on March 16, 2013, 09:41
The topic certainly "has legs". In the best Victorian tradition they should be covered. ;D
Title: Re: Isle of Stoner Railway Blog - Progress at Underhill
Post by: Isle of Stoner on March 16, 2013, 16:43
I agree, I forgot the crucial drawings pins. At the AGM no sensiblities need be offended. ::)

John W